Saturday, November 10, 2007
Attachment Day 46Monday5/11/07Tuan came and gave us training of Graseby 3300 pump and gave us the manual for our own reference.
He also helped us with the PM on that 3300 pump using his accuracy gauge special tool which Mount Alvernia does not have.
3300 PCA pump is designed similar to the M16A syringe driver, the only different is the size and it can be program according to the patient's dosage of drugs.
After lunch, Melvin, Mr Loh and me went up to the wards to do PM for quite a number of equipments.
I did the Electrical safety test for Infant Warmer equipment while Melvin did the testing for the temperature check.
I did not know where to ground the infant warmer at first so i clip the ground cable to the metallic pole. The ESA test failed and i tried to clip the ground cable to one of its screws nearer to the circuit board and so it pass the leakage current test at last.

(Infant Warmer by Fisher & Paykel healthcare)
Next, it is the humidifier equipment.
It is use to warm the air to a certain preset temperature and then pass to the patient's lungs.
We will need to do the same ESA test and temperature check for this machine.

This picture below shows the Lactina Breast Pump.
The grey and white equipment that has a reading of 141 is the pressure tester for this breast pump.
There are three adjustment to the pressure:
Minimum is range from 100mmHg to 150mmHg.
Medium is range from 200mmHg to 250mmHg.
Maximum is range from 300mmHg to 350mmHg.
Tuesday, November 6, 2007
Attachment Day 41
Monday
29/10/07
Tuas office
Phillip office
SGH BME
Tuas office
Attachment Day 42
Tuesday
30/10/07
SGH
Bukit Merah LSTC
Attachment Day 43
Wednesday
31/10/07
TTSH
NUH
TTSH
Attachment Day 44
Thursday
1/11/07
MAH
bear hugger
Attachment Day 45
Friday
2/11/07
Graseby 3300
Medela breast pump
oxygen concentrator