Tuesday, September 18, 2007


Attachment day 12:
tuesday

time seems to past very fast today.
william and i stay at Mount Alvernia the whole working day to sort out the paperwork there as one of the engineer from IDS just left that place.
and he had some paperwork and PM services not completed.

checked through the files of PM services from May onwards all the way till Sept.
that previous engineer has made quite a number of serious mistakes in his PM service and i shall not elaborate.
Met stephen, the IDS boss, at Mount Alvernia in the evening, he came here to oversee things and tidy up the mess as well.

William ask boss to reserve me a place in IDS because after my attachment i can start work as full time liao. then the boss says he will reserve a place for me.
then i said the time is still long to decide anything now, both of them laughed.

We went up to the sterilizer room and we have to wear the 'full armour' to enter.
i am not sure what is wrong with the machine but saw them doing the leak test and went to the back of the sterilizer to check the air pressure.

its my first time seeing sterilizer and its huge!
thats all for today.
i went home from Mount Alvernia Hospital.
It is located opposite Macritchie reservoir.


pics:



(went to opposite Mt Alvernia that Assassi home or day care centre to do checking of equipment)


(this is Oxygen Concentrator providing pure oxygen to patient) xD


(sterilizer ! got 2 in the pic.)


(Close up abit)


(More close up to the panel ! xP )


(behind of sterilizer ! wow ! )


(oh ya.. go into that room must wear this !)


( and this ! WTH>>> LOL)


7:43 PM i need you.